Fort Drum Memorial Drive | NYSDOT: major road construction on Fort Drum Memorial Drive at US 11. starting 8:50 AM, 07/22/10 until further notice. Comment: This is the construction of the future I-781, Fort Drum Connector , between Fort Drum and I-81. There may be daily lane closures controlled by flaggers on Routes 11 and 37. Last update: 7/22/2010 8:52:42 AM | |||
I-81 | NYSDOT: bridge construction on I-81 in both directions from Exit 41; NY 178; West Church Street to Exit 42; NY 177 Ramp. starting 7:00 AM, 08/02/10 until further notice. Comment: Work is underway on the bridge carrying Michael Rd. over I-81. Last update: 11/5/2010 8:24:52 AM | |||
I-87 Northway | NYSDOT: bridge construction, left lane closed on I-87 Northway southbound at Exit 24 - Riverbank. starting 12:00 PM, 04/29/10 until further notice. Comment: This area is reduced to one lane in each direction. There is a lane shift in place for the southbound traffic. Last update: 11/3/2010 9:34:20 AM | |||
I-87 Northway | NYSDOT: right shoulder closed on I-87 Northway southbound from City of Plattsburgh; Town of Plattsburgh Line to Exit 38B - NY 22; Route 374 due to bridge maintenance operations. starting 2:22 PM, 07/07/09 until further notice. Comment: Shoulder closed for bridge repair. Last update: 7/7/2009 2:30:06 PM | |||
I-87 Northway | NYSDOT: bridge construction on I-87 Northway from NY 22 to Exit 35 - NY 442 Ramp. starting 2:30 PM, 08/03/10 until further notice. Comment: The bridge carrying CR 38 (Arthur Rd) over I-87 is being replaced. CR 38 has been restricted to one lane , 12 feet wide, with traffic controlled by temporary traffic signals. Last update: 8/3/2010 2:34:44 PM | |||
NY 12F | NYSDOT: closed to traffic on NY 12F from NY Paddy Hill Road to I-81 due to closed to traffic. starting 6:55 AM, 11/04/10 until further notice. Last update: 11/4/2010 6:59:27 AM | |||
NY 12F | NYSDOT: closed to traffic on NY 12F from NY Paddy Hill Road to I-81 due to closed to traffic and due to closed to traffic. starting 6:48 AM, 11/04/10 until further notice. Last update: 11/4/2010 6:50:54 AM | |||
NY 12F | NYSDOT: closed to traffic on NY 12F from NY Paddy Hill Road to I-81. starting 6:42 AM, 11/04/10 until further notice. Last update: 11/4/2010 6:43:26 AM | |||
NY 185 | NYSDOT: closed to traffic on NY 185 in both directions from Crown Point Bridge to Vermont State Line. starting 1:35 PM, 10/16/09 until further notice. Comment: See: More Info. The free Lake Champlain Ferry Service to Vermont is now available at Crown Point. The ferry operates 24 hours a day, year round, with several daily scheduled crossings. Motorists access the ferry from a service road off of the east end of Bridge Road (NY Route 185). Last update: 2/26/2010 1:19:54 PM | |||
NY 190 | NYSDOT: reduced to one lane on NY 190 in both directions from Franklin; Clinton County Line to Town of Ellenburg; Town of Altona Line due to paving operations starting 7:00 AM, 08/31/10 until further notice on weekdays. Comment: Road paving. One lane closed. Last update: 7/13/2010 11:23:56 AM | |||
NY 22 | NYSDOT: road construction, single line traffic alternating directions on NY 22 in both directions from Town of Willsboro; Town of Essex Line to Town of Chesterfield; Town of Willsboro Line. starting 6:30 AM, 08/16/10 until further notice. Comment: This roadwork will be on Rte 22 in the area of Reber Rd North & the railroad over pass in the Hamlet of Wilsboro. Last update: 9/13/2010 11:49:13 AM | |||
NY 3 | NYSDOT: bridge maintenance operations, temporary traffic lights on NY 3 at Franklin County; Clinton County Line. starting 1:38 PM, 09/16/10 until further notice. Last update: 9/16/2010 1:40:00 PM | |||
NY 30 | NYSDOT: bridge construction on NY 30 at CR 5; Wells until 5:30 PM, 12/03/10 on weekdays. Comment: Bridge is open to two-way traffic. Shoulder closures and minor delays. Last update: 10/28/2010 11:54:50 AM | |||
NY 37 | NYSDOT: bridge maintenance operations on NY 37 from New York Avenue; CR 6 to Start of NY 812 Overlap for the next two months. starting 7:48 AM, 09/23/10 until 6:48 AM, 11/22/10. Comment: The bridge carrying Rt 37 over the Oswegatchie River is being painted. There will be daily lane closures with traffic controlled by flaggers. Last update: 9/23/2010 7:52:13 AM | |||
NY 37B | NYSDOT: closed to traffic on NY 37B northbound from Parker Avenue; NY 37B to Center Street. starting 5:15 PM, 06/03/10 until further notice. Comment: North bound lane from East Orvis to Center st. closed due to deck hole. until further notice,use alternate routes. Last update: 6/3/2010 5:38:26 PM | |||
NY 37B | NYSDOT: reduced to one lane on NY 37B in both directions from Parker Avenue; NY 37B to East Orvis Street. starting 1:01 PM, 12/28/09 until further notice. Last update: 12/28/2009 1:05:29 PM | |||
NY 37B | NYSDOT: construction work on NY 37B from START ROUTE; NY 37B to END ROUTE; NY 37 starting 7:00 AM, 04/12/10 until further notice. Comment: The contractors work may involve daily lane closures controlled with signs and flaggers. Last update: 4/9/2010 1:26:48 PM | |||
NY 418 | NYSDOT: road construction, single line traffic alternating directions on NY 418 in both directions at Town of Warrensburg; Town of Thurman Line. starting 8:00 AM, 10/12/10 until further notice. Comment: Rte 418 at Milton St. Last update: 10/12/2010 8:05:55 AM | |||
NY 418 | NYSDOT: bridge construction, single line traffic alternating directions on NY 418 in both directions at Water Street; CR 45; Elm Street; CR 9 starting 7:00 AM, 06/08/10 until further notice. Comment: Rte 418 is reduced to one lane alternating traffic at Milton St in Warrensburg. There is a temporary traffic signal controlling traffic for long term bridge work. Last update: 6/7/2010 1:52:49 PM | |||
NY 442 | NYSDOT: reduced to one lane on NY 442 at I-87 due to bridge construction. starting 11:10 AM, 09/07/10 until further notice. Comment: The bridge carrying Rt. 442 over I-87 is reduced to one lane, controlled by temporary signals. Last update: 9/7/2010 11:14:10 AM | |||
NY 812 | NYSDOT: reduced to one lane on NY 812 from Town of Oswegatchie; Village of Heuvelton to Village of Heuvelton; Town of Oswegatchie due to bridge construction. starting 10:06 AM, 05/26/09 until further notice. Comment: The bridge carrying Route 812 over the Oswegatchie River is being replaced. Temporary traffic signals are in place and there is an 10' width restriction. Last update: 10/5/2010 2:46:35 PM | |||
NY 812 | NYSDOT: construction work, reduced to one lane on NY 812 from Proctor Avenue; Ramp to Ogdensburg-Prescott Bridge; NY 812 until 2:00 PM, 11/28/10 Last update: 5/26/2010 8:17:08 AM | |||
NY 9N | NYSDOT: road construction on NY 9N from Clinton; Essex County Line to Town of Black Brook; Town of Ausable Line. starting 3:44 PM, 08/19/09 until further notice. Last update: 8/19/2009 3:52:05 PM | |||
US 11 | NYSDOT: construction work on US 11 from NY 2U; Village of Rouses Point; Town of Champlain; US Customs Station to Canada Line; END ROUTE. starting 3:34 PM, 07/29/10 until further notice. Last update: 7/29/2010 3:37:19 PM |
Saturday, November 6, 2010
Update from NYTA 511
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment